For a little more than a year of the work the following projects were successfully implemented:

  1. the construction of water intake Stryisky (c. Striy, the length - 2800m, the installation of pipes of the diameter of 280 mm, the deadline - two months);
  2. of the pressure water supply Voyutytskyi distillery (v. Voyutychi, the length - 1800 m., the installation of pipes of the diameter of 160 mm, the deadline – a half-year);
  3. of the pressure water supply in the c. Horodok (the length - 2500m, the installation of pipes of the diameter of 315 mm, the deadline – a half-month).
  4. Currently "Instalbud" with two partner firms is engaged in the construction of water supply and sanitation for the new neighbourhood "New world" in the city of Stryi. The company performs earthworks (pits and trenches) for water and sanitation, welds and puts pipes, leads water pipes directly into plots for construction of future buildings. This technique of the work complies with European practices, firstly engineering networks are built, then, already houses themselves. The total length of plumbing is five kilometres. The length of the sewage works, which are performed by "Instalbud" is 1300 m.

Photo Album